Small Office and Workshop to Passive House standard

As the Architect’s own project, this is an experiment in making a very small building “passive”. The walls, floor and roof are insulated to a very high level and attention to detail right from the design-stage onwards was the top priority. A small air-conditioning unit will provide heating, cooling and hot water. The MVHR unit is for installation reasons larger than it needs to be. Now in its final stage of being self-built, it is hopefully to be finished and certified later in 2026.

Interested in starting your own project with us?